| Sl. No | Project | Capacity | Fuel Used | Remarks |
| 1. | SWIL Ltd, Gujarat | 15 MW DG | Furnace Oil | - |
| 2. | Kadakia Alkakies, Gujarat | 10.5 MW DG | Furnace Oil | Shifting of used power plant |
| 3. | Sinarmas Pulp & Paper.,
Karnataka | 30 MW | Coal | (Piping Engineering) |
| 4. | Kanoria Chemicals Ltd., U.P. | 30 MW
| Coal | |
| 5. | Grasim Industries
Ltd., Tamil Nadu | 12 MW | Coal /
Lignite | (In association with M/s.Holtec, Delhi) |
|
6. | Grasim Industries Ltd., Kotpuli, Rajasthan |
2 x 23 MW | Coal / lignite | (In
association with M/s.Holtec, Delhi) |
| 7. |
J.P.Cements, Bagheri , Himachal Pradesh | 1 x 30 MW |
Coal / Lignite | (In association with M/s.Holtec,
Delhi) |
| 8. | J.
P.Cements, Chunar, uttar Pradesh | 1 x 38 MW |
Coal / Lignite | (In association with M/s.Holtec,
Delhi) |
| 9. | J.P.Rewa Cements,
Madhya Pradesh | 38.5 MW | Coal | (In association with M/s. Holtec,
Delhi) |
| 10. | Electro Steel
Castings Ltd., West Bengal | 3.5 MW | BFG / Oil | - |
| 11. | Lanco Industries Ltd., A.P. | 2.5 MW | BFG / Oil |
(Performance Improvement & Revamping) |
| 12. | Usha Ispat Ltd., Goa. | 3 MW | BFG / Oil | Design of Boiler |
| 13. | EID Parry, Ennore. | 4 MW | Waste Heat From Process Gas | Concept to
commissioning consultancy services |
| 14. | Shyam Group of Companies (Burdhwan)
| 5 MW (3 x 45 TPH + 1 x 15 TPH) | Waste heat from sponge iron plant | Detailed Project Report |
| 15. | Shyam Group of Companies (Ranigarh)
| 7.38 MW (3 x 10.5 TPH) | Waste
heat from sponge iron plant | Detailed Project
Report |
| 16 | Adhunik Alloys and
Energy Ltd | 1 x 30 MW | | Detailed Project |
| 17. | Singhal
Enterprises | 7.2 MW (2 x 10 TPH) | Waste heat recovery from sponge iron plant | Detailed Project Report & Detailed Engineering for
CPP |
| 18. | Electro Steel
Castings Ltd., | Under Progress (1 x 52 TPH + 1 x 115
TPH) | Waste heat recovery coke oven battery flue
gas | Feasiblity report for CPP |
| 19. | Aarti Steels Ltd.,Orissa | 40 MW (1 x 52 TPH + 1 x 115 TPH) | Washery
rejects, coal, char | Detailed Engineering for
CPP |
| 20. | Adhunik Ferro
Alloys Ltd., | 16 MW (3 x 10 TPH + 1 x 46 TPH) | Waste heat recovery and AFBC | Detailed
Project Report |
| 21. | Bhushan Limited.,Orissa | 16 MW 40 MW (2 x
52 TPH + 1 x 75 TPH) | Waste heat recovery and
AFBC | Piping Layout, Instrumentation |
| 22. | Bhushan Limited.,Orissa | 60 MW | Coal,Char and Washery
Rejects | Piping Engineering &
Instrumentation |
| 23. | Jai
Balaji Sponge Ltd., | 12 MW | Waste
heat recovery and AFBC | Detailed Project Report &
Detailed Engineering |
| 24. | Kamachi Sponge Iron Ltd | 1 x 10 MW | Waste Heat Recovery | Detailed Engineering |
|
25. | Gallant Metals Limited | 1 x 25 MW | Coal / Kutch, Kutch Lignite | Detailed
Engineering Services26. |
| 26. | Neo Metaliks Limited | 4.5 MW | BFG | Detailed Engineering Services |
|
27. | Action Ispat & Power (P) Ltd., | 1 x 12 MW | Coal / Char / Washery Rejects | Detailed
Engineering Services |
| 28. | AML Steel and Power (P) Ltd | 9.6 MW | | Detailed engineering services |
|
29. | Adhunik Metalliks Ltd., Jharkhand | 2 x 17 MW | Coal / Char / Washery Rejects | Detailed
engineering services |
| 30 | Ind Synergy Limited., Raipur | 1 x 50 MW | Coal / Char / Washery Rejects | Detailed
engineering services |
| 31 | Shri Ramrupai Balaji Steels Ltd | 2 x 25 MW | Waste heat, recovery, Dolochar & Washery Rejects |
Detailed Engineering |
| 32. | Kohinoor Steels Ltd | 17 MW | Waste heat, recovery, Dolochar & Washery Rejects |
Detailed Engineering |
| 33 | Bhushan Power & Steel Limited | 2 x 8 MW | Coke Oven gas based waste heat recovery |
Detailed Engineering |
| 34. | Chettinad Cement | 15 MW | Coal / Lignite | (In association with M/s.
Holtec, Delhi) |
| 35. | OCL
Limited | 8 MW | Washery Rejects /
Coal/Char | (In association with M/s. Holtec, Delhi)
|
| 36. | Govind
Ispat Ltd Chhattisgarh | 15 MW | Waste heat recovery and AFBC | Detailed
Engineering |
| 37. | Ma Chandi Durga Ispat (P)Ltd., West Bengal | 8 MW | Waste heat recovery From Sponge
Iron | Detailed Project Report, |
| 38. | Bhushan Steels & Strips Ltd
Orissa | (1*33MW & 1*77 MW) | Char&Washery Rejects | Piping Engineering,
System Engineering & Instrumentation |
| 39. | Aarti Steels Ltd
Phase - II | 40 MW
| Washery rejects, coal, char | Detailed Engineering for CPP
|
| 40. | Nirma Power
Limited., | 30 MW | Char
Coal,Lignite | (In Association with Holtec,Delhi)
|
| 41. | Sitapuram Power
Limited.,Andhra Pradesh | 40MW |
Coal, | Detailed engineering of CPP |
| 42. | Vasavadatta Cement., | 17.5 MW | Coal | (In
Association with Holtec,Delhi) |
| 43. | CMEC,China., | 2*23 MW | Coal,Lignite,PetCoke | Vikram Cements
Ltd.,Gujarat |
| 44. | CMEC,China., | 4*23 MW | Coal,Lignite,PetCoke | Gujarat Cements
Works Ltd., Gujarat |
| 45. |
Mangalam Cement Ltd |
17.5 MW
| Coal | (In Association
with M/s.Holtec, Delhi) |
| 46. | Holcim Lanka Limited | 4.5 MW | Coal /Biomass | (In Association with M/s.Holtec,
Delhi) |
| 47. | Binani Cement Ltd | 2 x 20 MW | Coal / Lignite / Petcoke | (In Association with
M/s.Holtec, Delhi) |
| 48. | Chettinad Cement Ltd | 15 MW | Coal / Lignite / Petcoke | (In
Association with M/s.Holtec, Delhi) |