| YEAR
ESTABLISHED |
1995 |
| BOARD
OF DIRECTORS |
Mr. G.V.Raman
Mr. S. Balasubramanian
Mr. P.S.Sankaranarayanan
Mr. K. Ragothaman
Mrs.V. Janaki
Mrs.R. Vasantha
Mrs.S. Shobana
Mrs.R. Usha
|
| CHIEF-INSTRUMENTATION |
K.
RAMANI
30 years experience in Design,
Maintenance,Construction, Project Management,
Commissioning and Consultancy in
Instrumentation. |
| PERSONNEL |
| Engineers |
5 |
| Technicians
/ Draftsman |
3 |
| Administrative
Personnel |
2 |
SERVICES
-
Detailed Engineering Services in the
area of Instrumentation for Power,
Petrochemical, Refineries Fertilizers,
Paper, Cement, Sugar and other Industries.
-
Consultancy services in the area of
Instrumentation for Power, Petrochemical,
Refineries, Fertilizers, Paper, Cement,
Sugar and other Industries.
-
Turnkey execution of Instrumentation
systems including PLC, DCS, SCADA.
-
Execution of Installation and
Commissioning of process Plant
Instrumentation.
-
Annual Maintenance of Plant
Instrumentation
-
Design and Supply of control Panels to
suit Customer's requirements.
-
Project Management of Instrumentation
Installation and Commissioning.
|
SPECIALISATION:
-
Accurate estimate of erection hardware
for Plant Instrumentation.
-
Tuning and Commissioning of various
complicated control loops like Boiler
Three Element control, Combustion control
etc.,.
-
Modernisation of Old Plant
Instrumentation / changing over to New
Instrumentation (like PLC/DCS) with
minimum down time of plant.
-
Training of Instrument Engineers /
Operators for Co-Gen Plants.
-
Installation Services in big plants
(more than 3000 loops) involving DCS and
Field instruments.
-
Working under very tight Schedules and
completion of job in time with quality.
-
Studying Old Plants and suggesting
modification / revamp of Instrumentation
to result in high Productivity / increased
Efficiency with minimum additional
investment.
-
Design and Development of complicated
logics and Control loops.
|
| MAJOR
PROJECTS HANDLED: |
| 1. NEW
CHEM WIRE |
- Total Project Management services for
effluent treatment plant for GMR Vasavi
Power Station at Basin Bridge - STATUS
-COMPLETED.
|
| 2.
KCP-Vuyyuru, Vijyawada, Andhra Pradesh. |
-
Detailed Engineering Services,
Procurement of DCS, Instrumentation,
Installation management and commissioning
of 2X100 T/HR Boilers. STATUS - COMPLETED.
|
3.
- M/s. BANNARI AMMAN SUGARS
- M/s. EID PARRY LTD.,
- M/s. THIRUAROORAN SUGARS
- M/s. JYOTHI BIO ENERGY LTD.,
- M/s. SAGAR SUGARS LTD.,
- M/s. ARUNACHALAM SUGARS LTD.,
- M/s. PRABULINGESWARA SUGARS etc.,
|
- Consultancy and detailed engineering
Services in Instrumentation for various
Co-Generation plants with DCS.
|
| 4. ABB
AUTOMATION |
- Detailed Engineering for Sugar Plant
Instrumentation for ABB Automation.
STATUS- IN PROGRESS
|
| 5.
ENGELHARD ENVIRONMENTAL SYSTMES (I) LTD |
- Project Management & Engineering
Assistance for 'Slurry Preparation' for
Catalytic Converter Plant. STATUS -
COMPLETED
|
| 6.
PROTCHEM INDUSTRIES (INDIA) LTD: |
- Design, Fabrication, Supply, Erection
& Commissioning of Instrument Control
Panel with controllers. STATUS -
COMPLETED.
|
| 7.
AUTOMATION OF PROCESS EQUIPMENT: |
- Priya Pickles, Vijayawada - Supply /
Installation commissioning of PLC based
Systems.
- Rane Brake Linings, Madras - Supply of
Temperature Scanners with PCIM Software
for SCADA application. STATUS - COMPLETED.
|
| 8.
ANNUAL MAINTENANCE OF INSTRUMENTATION: |
- AKASH AROMATICS - Annual Maintenance of
PLC / Instrumentation
- BUSH BOAKE ALLEN (I) LTD - Annual
Maintenance of PLC / Instrumentation
- COOKSON INDIA LTD., - Annual Maintenance
of PLC / Instrumentation
|
GROUP
COMPANY:
Avant-Garde Engineers and Consultants (p)
Ltd., Chennai. |
OTHER
INFORMATION:
- AGSC has the capability of executing
installation projects under tight schedule
by deploying the required work force and
material.
- We shall provide the necessary Tools
& Equipments as required for project
completion in time.
- AGSC has in-house strength of developing
any complicated instrumentation related
drawings and software to suit customers
need.
|